# PICSA Offshore — Asset-Integrity Work-Pack Template

**Status:** Working draft — engineering approval required

## Integrity basis
- Asset, component, material and service environment
- Suspected degradation mechanism and known history
- Integrity objective and decision required
- Responsible technical authority

## Preparation and inspection
- Required access and preparation condition
- Selected inspection or NDT technique
- Inspection procedure, coverage and sensitivity
- Hold points and acceptance criteria

## Repair and protection interface
- Engineering disposition route
- Repair method and responsible contractor
- Surface protection or treatment requirement
- Reinstatement and return-to-service conditions

## Required records
- Location and asset traceability
- Before, during and after evidence
- Inspection results and authorised disposition
- Deviations, concessions and corrective action
- Completion certificate and handover dossier

**Control note:** PICSA does not assume NDT or engineering authority unless that responsibility is explicitly contracted and supported by verified competence.