Insights
Knowledge for better offshore decisions.
Technical perspectives, service guidance and field lessons for teams planning specialist offshore work.
Featured Insight
Start With The Asset,
Not The Technology.
PICSA Insights turns offshore service knowledge into practical choices for integrity, maintenance, construction, decommissioning and procurement teams.

Start With The Asset Need, Not The Technology
A practical framework for selecting subsea, integrity, specialist-technology and project-delivery support around the required outcome.
Knowledge Library
Explore PICSA Insights.

Structuring A Subsea IRM Work Package
Connect the inspection objective, access method, specialist interfaces, controls and acceptance evidence before mobilisation.

Selecting ROV Systems And Tooling Around The Task
Why water depth, intervention loads, sensing, visibility, vessel interfaces and evidence requirements should drive equipment selection.

Preparation Is Only Valuable When It Enables A Decision
Connect access, preparation, NDT, engineering disposition, repair and return-to-service within one integrity pathway.

Laser Cleaning Versus Abrasive Blasting
Compare the complete work scope: substrate response, required profile, containment, waste, access, clean-down and programme.

What Can Laser Cleaning Remove?
A practical view of corrosion, oxide layers, selected coatings, residues and weld discolouration - and where trials remain essential.

Building A Controlled Surface-Treatment Sequence
Preparation, chemistry, process control, compatibility and inspection must work as one protection system.

Different Services Need Different Control Sets
Marine operations, lifting, energy, access, exposure, waste and laser hazards must be controlled around the actual work package.

Agree Acceptance Before Mobilisation
How hold points, inspection authority, traceability, deviations and handover evidence prevent disputes at completion.

A Standards List Is Not A Compliance System
Turn legislation, standards and client procedures into a controlled register of requirements, owners, evidence and approvals.

Portable Does Not Mean Deployment-Ready
Systems, tooling, utilities, lifting, access, weather, controlled areas and simultaneous operations still require disciplined planning.